PROJECT 2021-2025

Salt effluent concentration section.

Development of a turnkey equipment complex for a salt effluent concentration section.

WORKS

Reagent treatment of water circulation cycles of water supply systems:

• Development of technology
• Supply of equipment for wastewater treatment with the production of 120 m3/h of purified water, but reuse and concentration of 10 m³/h of concentrate for disposal
• Engineering with a set of technical documentation. An extended warranty for a period of 3 years is provided.

• Technology
• Basic engineering
• Detailed engineering
• Equipment supply
• Reagent supply
• Installation supervision
• Commissioning
• Personnel training

PROJE 2021-2025

Tuz efluant konsantrasyon bölümü.

Tuz efluant konsantrasyon bölümü için anahtar teslimi ekipman kompleksinin geliştirilmesi.

ÇALIŞMALAR

Su temin sistemlerinin su sirkülasyon çevrimlerinin reaktif arıtımı:

• Teknolojinin geliştirilmesi
• 120 m3/h saf su üretimi, ancak yeniden kullanımı ve bertaraf için 10 m³/h konsantre konsantrasyonu ile atık su arıtımı için ekipman tedariki
• Teknik dokümantasyon seti ile mühendislik. 3 yıllık bir süre için uzatılmış garanti sağlanır.

• Teknoloji
• Temel mühendislik
• Detaylı mühendislik
• Ekipman tedariki
• Reaktif tedariki
• Kurulum denetimi
• Devreye alma
• Personel eğitimi


PROJECT 2021-2025

Salt effluent concentration section.

Development of a turnkey equipment complex for a salt effluent concentration section.

WORKS

Reagent treatment of water circulation cycles of water supply systems:

• Preparation of the site for equipment installation

• Supervision of installation and adjustment of equipment

• Supply of reagents

• Warranty testing

• Personnel training.

An extended warranty period of 3 years is provided.

• Technology

• Basic engineering

• Detailed engineering

• Supply of equipment

• Supply of reagents

• Supervision of installation Commissioning

• Personnel training

PROJE 2021-2025

Tuz efluant konsantrasyon bölümü.

Tuz efluant konsantrasyon bölümü için anahtar teslimi ekipman kompleksinin geliştirilmesi.

ÇALIŞMALAR

Su temin sistemlerinin su sirkülasyon çevrimlerinin reaktif arıtımı:

• Ekipman kurulumu için sahanın hazırlanması

• Ekipman kurulumunun ve ayarlarının denetlenmesi

• Reaktiflerin tedariki

• Garanti testi

• Personel eğitimi.

3 yıllık uzatılmış garanti süresi sağlanır.

• Teknoloji

• Temel mühendislik

• Detaylı mühendislik

• Ekipman tedariki

• Reaktiflerin tedariki

• Kurulum denetimi Devreye alma

• Personel eğitimi

PROJECT 2021-2024

Casting and rolling complex section.

Reconstruction of recycling water supply facilities of the LPK.

WORKS

• Survey of the existing recycling water supply system of the LPK

• Development of solutions for changing the technological process of the existing technology
• Development of technical documentation
• Supply of additional equipment
• Technical work on reconstruction and adjustment
• Laboratory control by own forces.

• Technology
• Basic engineering
• Equipment supply
• Reagent supply
• Installation supervision
• Commissioning
• Personnel training

PROJE 2021-2024

Döküm ve haddeleme kompleksi bölümü.

LPK’nın geri dönüşüm suyu temin tesislerinin yeniden inşası.

ÇALIŞMALAR

• LPK’nın mevcut geri dönüşüm suyu temin sisteminin incelenmesi

• Mevcut teknolojinin teknolojik sürecini değiştirmek için çözümlerin geliştirilmesi
• Teknik dokümantasyonun geliştirilmesi
• Ek ekipman temini
• Yeniden inşa ve ayarlama konusunda teknik çalışma
• Kendi kuvvetlerimizle laboratuvar kontrolü.

• Teknoloji
• Temel mühendislik
• Ekipman temini
• Reaktif temini
• Kurulum denetimi
• Devreye alma
• Personel eğitimi

Information that must be posted on the Dilonni website

PROJECT 2024-2025
Water treatment complex of electric steelmaking shop. Reconstruction. Complex of continuous casting machine №3 and vacuumizer №2 and water-cooled flues of GMP/GMP2 furnaces. Total volume of circulation cycles 17,180 m3/h.

Equipment for water supply circulation cycles of the CCM №3 complex:

Manufacture and supply of VPU equipment with a capacity of 328 m³/h consisting of:

• circulation cycle of demineralized water A1;
• circulation cycle of deeply demineralized water CCM №3;
• “clean” circulation cycle of water supply to filters CCM №3;
• “dirty” circulation cycle of water supply CCM №3.

Equipment for water supply circulation cycles of vacuumizer №2 with a capacity of 916 m3/h:

• “clean” circulation cycle of water supply to vacuumizer №2-82 (open cooling circuit of cold water)
• “dirty” circulation cycle of water supply to vacuumizer

Equipment for water supply circulation cycles of the CCM №3 complex:

• Equipment for preparing demineralized water
• Equipment for feeding reagents
• Equipment for cleaning blowdown water
• Equipment for preparing “make-up” water
• Equipment for sludge dewatering
• Emergency water supply

Equipment for water supply circulation cycles of water-cooled gas ducts GMP-1.2 and a Vacuumizer with a capacity of 15,100 m3/h

• Water supply circulation cycle of demineralized water AZ
• Water supply circulation cycle of demineralized water A4 (closed cooling cycle QW)
• “Clean” water supply circulation cycle (cold side) of water-cooled gas ducts GMP-1.2

Equipment for the water supply cycle of the wheel rolling shop:

• Clean cycle, capacity 715 m3/h
• Dirty cycle, capacity 120 m3/h

WORKS

Development of technology, production and supply of the entire complex of equipment “turnkey”:

development of documentation, production and supply of the entire complex of equipment, installation, commissioning, personnel training, warranty service.

• Technology Basic engineering
• Detailed engineering
• Equipment supply
• Reagent supply
• Installation supervision
• Commissioning
• Personnel training

PROJE 2024-2025
Elektrikli çelik üretim atölyesinin su arıtma kompleksi. Yeniden yapılandırma. Sürekli döküm makinesi №3 ve vakumlayıcı №2 kompleksi ve GMP/GMP2 fırınlarının su soğutmalı bacaları. Sirkülasyon döngülerinin toplam hacmi 17.180 m3/h.

CCM №3 kompleksinin su temini sirkülasyon çevrimleri için ekipman:

328 m³/h kapasiteli VPU ekipmanının imalatı ve tedariği şunlardan oluşur:

• A1 demineralize su sirkülasyon çevrimi;
• CCM №3 derin demineralize su sirkülasyon çevrimi;
• CCM №3 filtrelerine su temininin “temiz” sirkülasyon çevrimi;
• CCM №3 su temininin “kirli” sirkülasyon çevrimi.

916 m3/h kapasiteli vakumlayıcı №2’nin su temini sirkülasyon çevrimleri için ekipman:

• №2-82 vakumlayıcısına su temininin “temiz” sirkülasyon çevrimi (soğuk suyun açık soğutma devresi)
• vakumlayıcıya su temininin “kirli” sirkülasyon çevrimi

CCM №3 kompleksinin su temini sirkülasyon çevrimleri için ekipman:

• Demineralize su hazırlama ekipmanı
• Reaktif besleme ekipmanı
• Üfleme suyunu temizleme ekipmanı
• “Takviye” suyu hazırlama ekipmanı
• Çamur susuzlaştırma ekipmanı
• Acil su temini

GMP-1.2 su soğutmalı gaz kanallarının su temini sirkülasyon çevrimleri ve 15.100 m3/h kapasiteli bir Vakumlayıcı için ekipman

• AZ demineralize suyun su temini sirkülasyon çevrimi
• A4 demineralize suyun su temini sirkülasyon çevrimi (kapalı soğutma çevrimi QW)
• GMP-1.2 su soğutmalı gaz kanallarının “Temiz” su temini sirkülasyon çevrimi (soğuk taraf)

Tekerlek haddeleme atölyesinin su temin döngüsü için ekipman:

• Temiz döngü, kapasite 715 m3/h
• Kirli döngü, kapasite 120 m3/h

İŞLER

Teknolojinin geliştirilmesi, tüm ekipman kompleksinin üretimi ve tedariki “anahtar teslimi”:

dokümantasyonun geliştirilmesi, tüm ekipman kompleksinin üretimi ve tedariki, kurulum, devreye alma, personel eğitimi, garanti hizmeti.

• Teknoloji Temel mühendislik
• Detaylı mühendislik
• Ekipman tedariki
• Reaktif tedariki
• Kurulum denetimi
• Devreye alma
• Personel eğitimi

en_GBEnglish