Information that must be posted on the Dilonni website
PROJECT 2021-2025
Salt effluent concentration section.
Development of a turnkey equipment complex for a salt effluent concentration section.
WORKS
Reagent treatment of water circulation cycles of water supply systems:
• Development of technology
• Supply of equipment for wastewater treatment with the production of 120 m3/h of purified water, but reuse and concentration of 10 m³/h of concentrate for disposal
• Engineering with a set of technical documentation. An extended warranty for a period of 3 years is provided.
• Technology
• Basic engineering
• Detailed engineering
• Equipment supply
• Reagent supply
• Installation supervision
• Commissioning
• Personnel training
PROJE 2021-2025
Tuz efluant konsantrasyon bölümü.
Tuz efluant konsantrasyon bölümü için anahtar teslimi ekipman kompleksinin geliştirilmesi.
ÇALIŞMALAR
Su temin sistemlerinin su sirkülasyon çevrimlerinin reaktif arıtımı:
• Teknolojinin geliştirilmesi
• 120 m3/h saf su üretimi, ancak yeniden kullanımı ve bertaraf için 10 m³/h konsantre konsantrasyonu ile atık su arıtımı için ekipman tedariki
• Teknik dokümantasyon seti ile mühendislik. 3 yıllık bir süre için uzatılmış garanti sağlanır.
• Teknoloji
• Temel mühendislik
• Detaylı mühendislik
• Ekipman tedariki
• Reaktif tedariki
• Kurulum denetimi
• Devreye alma
• Personel eğitimi
PROJECT 2021-2025
Salt effluent concentration section.
Development of a turnkey equipment complex for a salt effluent concentration section.
WORKS
Reagent treatment of water circulation cycles of water supply systems:
• Preparation of the site for equipment installation
• Supervision of installation and adjustment of equipment
• Supply of reagents
• Warranty testing
• Personnel training.
An extended warranty period of 3 years is provided.
• Technology
• Basic engineering
• Detailed engineering
• Supply of equipment
• Supply of reagents
• Supervision of installation Commissioning
• Personnel training
PROJE 2021-2025
Tuz efluant konsantrasyon bölümü.
Tuz efluant konsantrasyon bölümü için anahtar teslimi ekipman kompleksinin geliştirilmesi.
ÇALIŞMALAR
Su temin sistemlerinin su sirkülasyon çevrimlerinin reaktif arıtımı:
• Ekipman kurulumu için sahanın hazırlanması
• Ekipman kurulumunun ve ayarlarının denetlenmesi
• Reaktiflerin tedariki
• Garanti testi
• Personel eğitimi.
3 yıllık uzatılmış garanti süresi sağlanır.
• Teknoloji
• Temel mühendislik
• Detaylı mühendislik
• Ekipman tedariki
• Reaktiflerin tedariki
• Kurulum denetimi Devreye alma
• Personel eğitimi
PROJECT 2021-2024
Casting and rolling complex section.
Reconstruction of recycling water supply facilities of the LPK.
WORKS
• Survey of the existing recycling water supply system of the LPK
• Development of solutions for changing the technological process of the existing technology
• Development of technical documentation
• Supply of additional equipment
• Technical work on reconstruction and adjustment
• Laboratory control by own forces.
• Technology
• Basic engineering
• Equipment supply
• Reagent supply
• Installation supervision
• Commissioning
• Personnel training
PROJE 2021-2024
Döküm ve haddeleme kompleksi bölümü.
LPK’nın geri dönüşüm suyu temin tesislerinin yeniden inşası.
ÇALIŞMALAR
• LPK’nın mevcut geri dönüşüm suyu temin sisteminin incelenmesi
• Mevcut teknolojinin teknolojik sürecini değiştirmek için çözümlerin geliştirilmesi
• Teknik dokümantasyonun geliştirilmesi
• Ek ekipman temini
• Yeniden inşa ve ayarlama konusunda teknik çalışma
• Kendi kuvvetlerimizle laboratuvar kontrolü.
• Teknoloji
• Temel mühendislik
• Ekipman temini
• Reaktif temini
• Kurulum denetimi
• Devreye alma
• Personel eğitimi
Information that must be posted on the Dilonni website
PROJECT 2024-2025
Water treatment complex of electric steelmaking shop. Reconstruction. Complex of continuous casting machine №3 and vacuumizer №2 and water-cooled flues of GMP/GMP2 furnaces. Total volume of circulation cycles 17,180 m3/h.
Equipment for water supply circulation cycles of the CCM №3 complex:
Manufacture and supply of VPU equipment with a capacity of 328 m³/h consisting of:
• circulation cycle of demineralized water A1;
• circulation cycle of deeply demineralized water CCM №3;
• “clean” circulation cycle of water supply to filters CCM №3;
• “dirty” circulation cycle of water supply CCM №3.
Equipment for water supply circulation cycles of vacuumizer №2 with a capacity of 916 m3/h:
• “clean” circulation cycle of water supply to vacuumizer №2-82 (open cooling circuit of cold water)
• “dirty” circulation cycle of water supply to vacuumizer
Equipment for water supply circulation cycles of the CCM №3 complex:
• Equipment for preparing demineralized water
• Equipment for feeding reagents
• Equipment for cleaning blowdown water
• Equipment for preparing “make-up” water
• Equipment for sludge dewatering
• Emergency water supply
Equipment for water supply circulation cycles of water-cooled gas ducts GMP-1.2 and a Vacuumizer with a capacity of 15,100 m3/h
• Water supply circulation cycle of demineralized water AZ
• Water supply circulation cycle of demineralized water A4 (closed cooling cycle QW)
• “Clean” water supply circulation cycle (cold side) of water-cooled gas ducts GMP-1.2
Equipment for the water supply cycle of the wheel rolling shop:
• Clean cycle, capacity 715 m3/h
• Dirty cycle, capacity 120 m3/h
WORKS
Development of technology, production and supply of the entire complex of equipment “turnkey”:
development of documentation, production and supply of the entire complex of equipment, installation, commissioning, personnel training, warranty service.
• Technology Basic engineering
• Detailed engineering
• Equipment supply
• Reagent supply
• Installation supervision
• Commissioning
• Personnel training
PROJE 2024-2025
Elektrikli çelik üretim atölyesinin su arıtma kompleksi. Yeniden yapılandırma. Sürekli döküm makinesi №3 ve vakumlayıcı №2 kompleksi ve GMP/GMP2 fırınlarının su soğutmalı bacaları. Sirkülasyon döngülerinin toplam hacmi 17.180 m3/h.
CCM №3 kompleksinin su temini sirkülasyon çevrimleri için ekipman:
328 m³/h kapasiteli VPU ekipmanının imalatı ve tedariği şunlardan oluşur:
• A1 demineralize su sirkülasyon çevrimi;
• CCM №3 derin demineralize su sirkülasyon çevrimi;
• CCM №3 filtrelerine su temininin “temiz” sirkülasyon çevrimi;
• CCM №3 su temininin “kirli” sirkülasyon çevrimi.
916 m3/h kapasiteli vakumlayıcı №2’nin su temini sirkülasyon çevrimleri için ekipman:
• №2-82 vakumlayıcısına su temininin “temiz” sirkülasyon çevrimi (soğuk suyun açık soğutma devresi)
• vakumlayıcıya su temininin “kirli” sirkülasyon çevrimi
CCM №3 kompleksinin su temini sirkülasyon çevrimleri için ekipman:
• Demineralize su hazırlama ekipmanı
• Reaktif besleme ekipmanı
• Üfleme suyunu temizleme ekipmanı
• “Takviye” suyu hazırlama ekipmanı
• Çamur susuzlaştırma ekipmanı
• Acil su temini
GMP-1.2 su soğutmalı gaz kanallarının su temini sirkülasyon çevrimleri ve 15.100 m3/h kapasiteli bir Vakumlayıcı için ekipman
• AZ demineralize suyun su temini sirkülasyon çevrimi
• A4 demineralize suyun su temini sirkülasyon çevrimi (kapalı soğutma çevrimi QW)
• GMP-1.2 su soğutmalı gaz kanallarının “Temiz” su temini sirkülasyon çevrimi (soğuk taraf)
Tekerlek haddeleme atölyesinin su temin döngüsü için ekipman:
• Temiz döngü, kapasite 715 m3/h
• Kirli döngü, kapasite 120 m3/h
İŞLER
Teknolojinin geliştirilmesi, tüm ekipman kompleksinin üretimi ve tedariki “anahtar teslimi”:
dokümantasyonun geliştirilmesi, tüm ekipman kompleksinin üretimi ve tedariki, kurulum, devreye alma, personel eğitimi, garanti hizmeti.
• Teknoloji Temel mühendislik
• Detaylı mühendislik
• Ekipman tedariki
• Reaktif tedariki
• Kurulum denetimi
• Devreye alma
• Personel eğitimi
Dilonni company has been operating for more than 20 years. Its first commercial activity is wholesale fabric trade. Over time, it has continuously improved itself and started to import wholesale fabric curtains and textile products to European and Asian countries.